Most viewed - Boat Building |

Krugers canoe gets a face lift.1452 views
|
|

20 feet doesn't fit on the Echo1165 views
|
|

Finished Chestnuts1089 views
|
|

Buried in Shavings933 viewsShaving down the cedar with the crooked knife takes a long time.
|
|

Kruger and Waddell's Canoe from 1971 crossing of Canada923 viewsThis 21 footer gets a face lift.
|
|

Ranger in the hallway920 views
|
|

Finished bark canoe917 viewsThis 14' canoe spent some quality time in the Quetico Wilderness.
|
|

New fiberglass for Krugers canoe893 viewsVerlens 1971 canoe gets a new layer of glass.
|
|

will it fit?891 views
|
|

Krugers canoe gets a face lift.887 views
|
|
![Filename=canoe[1].JPG
Filesize=133KiB
Dimensions=324x432
Date added=Oct 22, 2008 canoe[1].JPG](albums/userpics/10015/thumb_canoe%5B1%5D.JPG)
Cedarstrip864 viewsOutside is fiberglassed, ready to turn it over.
|
|

New paint job for the 1971 Kruger canoe849 views
|
|

Scott applies care to the old canoe.848 viewsScott Smith works to refurbish Kruger and Waddells canoe.
|
|

Krugers canoe gets refurbished.847 viewsEven the sticker from the original 1971 epic journey is replaced!
|
|

Fiddlehead Canoe by Harry Bryan845 viewsJordan sails the Fiddlehead canoe on Halifax Harbour.
|
|

20 footer Maiden Voyage826 views
|
|

Krugers canoe gets a face lift.811 views21 foot Sitka Spruce canoe...used in the 1971 crossing of Canada to the Bering Sea in 6-months by Clint Waddell and Verlen Kruger
|
|

Eran's Design808 viewsDesign of my 10 foot whitewater canoe.
|
|

Etching Canoe805 viewsWorking on the canoe in the yard scraping designs into the bark.
|
|

Krugers canoe looking good.784 views
|
|

Ready to Glass the inside770 views
|
|

Sheathing the Canoe758 viewsAdding ribs 7 sheathing to the birch bark canoe
|
|

The Saint751 viewsThis is the proto-type of the Saint converted to a true C-1. if you intrested how composite boats are made check out www.shaggydesigns.com
There's a awsome C-2 on the site to...paddlers sit back to back.
|
|

10 Foot playboat750 views10 foot playboat of my own design (for better or worse!) ready to start stripping. Filler project between other stuff so I'm not expecting rapid progress.
|
|

Replacing ribs and plank749 views16 ft Chestnut Pal
|
|

Dan finishes us the new paint job747 viewsKrugers canoe.
|
|

Ranger is outside745 views
|
|

Sanding sealed canvas715 views15 ft Chestnut Chum set up as solo
|
|

Krugers tired and worn out canoe from the epic 1971 paddle across Canada.698 viewsVerlen built this 110 lb Sitka spruce canoe for he and Clint Waddells historic crossing of Canada in one season...from Montreal to the Bering Sea in 6-months time. Thanks to Scott and Dan Smith in Michigan the canoe will be back in ship-shape to be used again.
|
|

Done, side view693 viewsPlayboat is ready for outfitting... just add water.
|
|
|