Boat Building |
 |
| TITLE |
+ |
- |
| FILE NAME |
+ |
- |
| DATE |
+ |
- |
| POSITION |
+ |
- |
|
|

20 feet doesn't fit on the Echo568 views
|
|

20 footer Maiden Voyage366 views
|
|

207 views
|
|

Etching Canoe417 viewsWorking on the canoe in the yard scraping designs into the bark.
|
|

Finished bark canoe435 viewsThis 14' canoe spent some quality time in the Quetico Wilderness.
|
|

Buried in Shavings444 viewsShaving down the cedar with the crooked knife takes a long time.
|
|
![Filename=canoe[1].JPG
Filesize=133KB
Dimensions=324x432
Date added=Oct 22, 2008 canoe[1].JPG](albums/userpics/10015/thumb_canoe%5B1%5D.JPG)
Cedarstrip411 viewsOutside is fiberglassed, ready to turn it over.
|
|

Ready to Glass the inside326 views
|
|

will it fit?375 views
|
|

Ranger in the hallway337 views
|
|

Ranger is outside276 views
|
|

Sheathing the Canoe294 viewsAdding ribs 7 sheathing to the birch bark canoe
|
|

Ready to go310 viewsBoat is built, ready for outfitting and paddling and we've got one eager padder waiting to go.
|
|

Done, side view335 viewsPlayboat is ready for outfitting... just add water.
|
|

Finished Chestnuts395 views
|
|

186 viewsBeam for raising canoe into balcony
|
|

Sanding sealed canvas282 views15 ft Chestnut Chum set up as solo
|
|

Replacing ribs and plank283 views16 ft Chestnut Pal
|
|

Eran's Design286 viewsDesign of my 10 foot whitewater canoe.
|
|

Dan's Ranger under construction186 views
|
|

Dan's Ranger under construction177 viewsCenter line cut, ready to plank the bottom
|
|

Dan's Ranger under construction184 viewsLooks good from far
|
|

Dan's Ranger under construction171 viewsProblems getting other side to match
|
|

Dan's Ranger under construction177 viewsCenter line not so straight
|
|

Dan's Ranger ready to be glassed195 views
|
|

Raising the grain - Dan's Ranger218 views
|
|

Bottom of Dan's Ranger210 views
|
|

Dan's Ranger - Glassed190 views
|
|

Glassed and 1 side sanded200 views
|
|

10 Foot playboat298 views10 foot playboat of my own design (for better or worse!) ready to start stripping. Filler project between other stuff so I'm not expecting rapid progress.
|
|
| 48 files on 2 page(s) |
 |
1 |  |
|